Global Switch
| CLIENT | Lehman Brothers |
| LOCATION | London Docklands |
| PROJECT | Fit Out |
| DISCIPLINE | Mechanical |
| SECTOR | IT / Telecoms |
| VALUE | £300K |
| ARCHITECT | Modus IX |
| CONSULTANT | Modus IX |
A fast track fit-out contract for Lehman Brothers in the latest facility of this kind, located in the London Docklands
Cititec were responsible for the off-site pre-fabrication and on-site manufacturing of 10 inch, flanged / class 1 welded CHW pipework which served the downflow AHU’s within this ‘Internet Hotel’.
Both the pipework and the Fire Duct were fully co-ordinated prior to off-site pre-fabrication and delivery – essential to maintain the aggressive installation programme.
SERVICES
- INSTALLATION
- LEAD CO-ORDINATORS
VALUE PROPOSITION
- FAST TRACK PROGRAMME
- DESIGN DEVELOPMENT
SYSTEMS
- CLOSE CONTROL CHW COOLING
- 2 PIPE FAN COILS
- CHW DISTRIBUTION
- SMOKE EXTRACT (‘FIRE DUCT’)
- FRESH AIR VENTILATION
- INSULATION
- COMMISSIONING
- WATER TREATMENT